ISO 14001:2026

14001-10 Planning of changes

3 min read · V, IA

All articles

For: V, IA
Source: ISO 14001:2026(en), fourth edition, English. 6.3, 8.1 insofar as it concerns changes, A.6.3

When the organization determines the need for changes that affect or can affect the environmental management system, the changes shall be carried out in a planned manner. The changes shall be controlled so that the organization can achieve the intended results of its environmental management system.

Note 1: The need for a change can arise from internal or external sources. Examples stand in A.6.3. Note 2: The control of changes is addressed in various requirements of this document. Examples stand in A.6.3. 6.3 itself contains no list of points that shall be considered for every change.

A.6.3 explains as guidance that the circumstances can be planned or unplanned. As part of controlling changes, the organization assesses expected changes and plans the expected effects and environmental impacts. Changes can arise from internal or external sources. The Annex says that the organization plans the implementation and control of temporary and permanent changes that can affect environmental performance, and it names examples: new or modified products, services, processes, activities, equipment or facilities; changes in compliance obligations; changes in knowledge about aspects, impacts or risks and opportunities; developments in knowledge and technology; changes in technical specifications of materials or process inputs; changes in corporate values through merger, acquisition, joint venture or divestment; changes in personnel or external providers, including contractors; interruption of operations, for example through supply chains, labour disputes, natural disasters, changes of regime, political unrest or war. These are examples in the guidance, not a required list in 6.3. A note there says that changes could create risks and opportunities.

The Annex names other places where requirements on dealing with change stand: environmental aspects in 6.1.2; internal communication in 7.4.2; control of documented information in 7.5.3; operational control in 8.1; the audit programme in 9.2.2; nonconformity and corrective action in 10.2. 8.1 additionally obliges planned changes to be controlled and the consequences of unintended changes to be reviewed, with actions against adverse effects if necessary. A.6.3 recommends that the consequences of unintended changes be reviewed. The requirement for that in operation stands in 8.1, not as a "shall" in 6.3.

Documented information: 6.3 does not require documented information.

Not in this text: a change form, and the example sources from A.6.3 as mandatory content of every change process. The wording of 6.3 in the 2015 edition is not reconstructed here.