ISO 9001:2026

9001-09 Risks and opportunities, two paths

5 min read · V, IA

All articles

For: V, IA
Source: ISO 9001:2026(en), sixth edition, English. 3.7, 5.1.1 k, 5.1.2 b, 6.1.1, 6.1.2, 6.1.3, A.6.1

Term. 3.7 defines risk as the effect of uncertainty. Note 1: An effect is a deviation from the expected, positive or negative. Note 5: The word "risk" is sometimes used when only negative consequences are possible. The definition is therefore broader than everyday use. "Chance" or "opportunity" is not defined in clause 3.

A.6.1.1 explains as guidance how the words are often understood in quality management: risk as an effect of uncertainty that can have a negative influence on the ability of the system to achieve its intended results; opportunity as circumstances that make it possible to achieve useful effects on the performance of the system. Risks and opportunities are different. They can be determined and addressed by separate processes. "Can" permits separate processes. It does not prescribe them as the only permissible form. The separation that the document itself makes lies in the actions: 6.1.2 for risks, 6.1.3 for opportunities.

6.1.1 Determining. When planning the quality management system, the organization shall consider the issues from 4.1 and the requirements from 4.2 and shall determine the risks and opportunities that shall be addressed in order to fulfil four purposes: to give assurance that the system can achieve its intended results; to prevent or reduce undesired effects; to achieve continual improvement; to enhance desired effects. Here risks and opportunities are determined together. The actions afterwards are separate.

6.1.2 Actions on risks. The organization shall determine, analyze and evaluate risks that can have an undesired effect on its ability to provide conforming products and services on a continuing and consistent basis and to enhance customer satisfaction. It shall plan actions to address these risks and plan how it integrates and implements these actions into the processes of the quality management system and how it evaluates the effectiveness of these actions. The actions taken shall be proportionate to the potential impact of the risks on the intended results of the system. The English wording is "proportionate to the potential impact".

Note 1: Certain risks can include those that concern the ability to provide conforming products and services during and after a disruption. Note 2 lists possible actions: avoid the risk, take a risk in order to pursue an opportunity, remove the source of the risk, change the likelihood or the consequences, share the risk or retain the risk by an informed decision. That is an example note. It does not draw 6.1.2 and 6.1.3 together into one common catalogue of actions. Taking a risk in order to pursue an opportunity remains a possible example, not an obligation.

A.6.1.2 explains as guidance that risk-based thinking supports decisions on how processes are planned, implemented and controlled, including when disruptive events occur. Disruptive events are incidents that negatively affect the planned provision of products and services. Application presupposes neither formal risk management nor a documented risk management process. ISO 31000 is named as guidance and is not available.

6.1.3 Actions on opportunities. The organization shall determine, analyze and evaluate opportunities that can have a desired effect on the same ability: to provide conforming products and services on a continuing and consistent basis and to enhance customer satisfaction. It shall plan actions on these opportunities, plan their integration and implementation into the processes and plan the evaluation of their effectiveness. Actions on opportunities shall fit the context of the organization and support the achievement of desired results. The English wording is "appropriate to the organization’s context and support the achievement of desired results". That is a different measure from proportionality to the impact in 6.1.2.

The note names possible actions: adopt new practices, launch new products or services, enter into new partnerships, use emerging technology, implement initiatives and other actions to address the current and changing needs and expectations of customers and other relevant interested parties. These are examples.

A.6.1.3 explains as guidance where opportunities can come from: evaluation of the external and internal context, needs and expectations of interested parties, capability, capacity and competence of the organization, results of monitoring and measurement. Sources can also be changed market conditions, emerging technology or regulatory requirements.

Further places that keep the two words apart. 5.1.1 obliges top management to promote risk-based thinking and opportunity-based thinking. 5.1.2 requires risks and opportunities to be determined and addressed that can affect conformity and the ability to enhance customer satisfaction. 4.4 requires the risks and opportunities determined in accordance with 6.1 to be addressed in the processes. 9.1.3 allows the effectiveness of the actions on risks and the effectiveness of the actions on opportunities to be evaluated separately. 9.3.2 takes both up separately as an input to the management review, with a reference to 6.1.2 and 6.1.3. 10.2 requires the risks and opportunities determined during planning to be updated, if necessary.

Documented information: 6.1 does not require documented information. A.6.1.2 says expressly that risk-based thinking does not presuppose a documented risk management process.

Not in this text: a risk matrix, a particular method, and the content of ISO 31000. Nor a common action plan in which risks and opportunities would have to be kept only as one list. The standard does not require that. It requires both to be determined and the actions to be planned separately.