logo
language iconarrow
menu icon

ISO 45001

45001-13 Emergency planning and response

3 min read · V, IA

All articles

For: V, IA
Source: DIN EN ISO 45001:2023-12, German, text version ISO 45001:2018. 8.2, connection with 6.1.2.1 d and 6.1.4 a 3. Annex A.8.2 as guidance. English for cross-checking.

8.2 requires the processes that the organization needs in order to prepare for and respond to potential emergency situations under 6.1.2.1. 6.1.2.1 d is the identification of potential emergency situations as a subject of hazard identification. 6.1.4 requires actions for this preparation and response to be planned.

The processes include:

a) a planned response, including the provision of first aid;

b) training for the planned response;

c) periodic testing and exercise of the planned response capability;

d) evaluation of performance and, where necessary, revision of the planned response, including after testing and in particular after emergency situations have occurred;

e) communication and provision of relevant information to all workers on their duties and responsibilities;

f) communication of relevant information to contractors, visitors, emergency services, authorities and, as appropriate, the local community;

g) taking into account the needs and capabilities of all relevant interested parties, and ensuring their involvement, as appropriate, in the development of the planned response.

8.2 names neither a time limit in days nor a specific number of exercises. “Wiederkehrend” is the requirement for testing and exercise.

A.8.2 consists of one sentence: emergency preparedness can take in natural, technical and human-caused events that occur inside and outside normal working hours. “Kann”. That is not a checklist of scenarios.

5.4 e 6 includes 8.2 in the participation of non-managerial workers when determining and effectively applying control measures.

Documented information: Documented information on the processes and on the emergency plans shall be maintained and retained (8.2).

Not in this text: an alarm plan as a form, a mandatory number of exercises, and the emergency requirements of ISO 14001:2026. That list is a different one. Here, 8.2 applies, including the addressees named in f.