42001-09 Operational planning and control

3 min read · V, IA

All articles

For: V, IA
Source: ISO/IEC 42001:2023(en), English. 8.1

8.1 requires the processes to be planned, implemented and controlled that are needed in order to meet requirements and to implement the actions determined in Clause 6, by establishing criteria for the processes and carrying out the control in accordance with the criteria.

The organization shall implement the controls determined under 6.1.3 that relate to the operation of the system. As an example the sentence names life-cycle-related controls on development and use. The effectiveness of these controls shall be monitored. Corrective actions shall be considered where the intended results are not achieved. Annex A lists the reference controls, Annex B gives the implementation guidance.

Planned changes shall be controlled. The consequences of unintended changes shall be reviewed. Actions to mitigate adverse effects shall be taken as necessary.

Externally provided processes, products or services that are relevant to the AI management system shall be controlled. Three separate controls for procurement, contractors and outsourcing, as in ISO 45001, are not in 8.1. Reference controls on third parties, suppliers and customers are in A.10, where they are necessary under 6.1.3, see 42001-18.

Documented information: It shall be available to the extent necessary in order to have confidence that the processes have been carried out as planned (8.1).

Not in this text: a work instruction as a template, an obligation to certify every supplier, and the life-cycle controls in detail. Those are in 42001-14. 8.1 implements the controls that 6.1.3 has determined to be necessary.