Explanations of ISO/IEC 17021-1:2015
Source is the bilingual edition DIN EN ISO/IEC 17021-1:2015-11 (EN ISO/IEC 17021-1:2015). The German text of the standard is the language…
Read articleISO/IEC 17021-1
For: V, EA
Source: 9.3.1
The initial certification audit shall be conducted in two stages.
The planning shall ensure that the objectives of stage 1 can be achieved. The client shall be informed of all on-site activities during stage 1. A note says that stage 1 does not require a formal audit plan under 9.2.3.
The objectives of stage 1 are:
A note says that it could be helpful to carry out at least parts of stage 1 at the place of operation. That is not a command to hold the whole of stage 1 on site. Stage 2, by contrast, shall take place at the client's site.
Documented conclusions on achievement of the objectives and on readiness for stage 2 shall be communicated to the client, including indications of weaknesses that could be classified as a nonconformity in stage 2. The documentation of stage 1 need not fulfil every requirement for a report under 9.4.8.
The interval between the stages shall take into account the client's need to find solutions for the weaknesses found in stage 1. The body can have to revise its arrangements for stage 2. Where there are significant changes that would affect the system, the body shall consider repeating stage 1 in whole or in part. The client shall be told whether the results of stage 1 can lead to a postponement or a cancellation of stage 2.
The purpose is the evaluation of implementation, including effectiveness. Stage 2 shall take place at the client's site and shall audit at least:
The team shall analyse all the information and evidence from both stages, evaluate the findings and agree on the audit conclusions.
Not in this text: the statement that stage 1 is only a review of documents, or that it may not produce findings. The objectives include the conditions at the site, conversations and readiness for stage 2. Weaknesses shall be named where they could become a nonconformity in stage 2. Whether parts of stage 1 take place on site is decided by the planning in the light of the objectives, not by a fixed house rule that this standard does not contain.